WWTP LOIOLA Works

Construction works of the 4th pumping line for the arrival of the Loiola WWTP.

Challenge achieved: Each of the pumping well lines has been replicated, that is, a new drive line for the Santa Catalina well, another for the Herrera well and another for the Urumea well, and changing two of the existing pumps in the Urumea well by two more efficient pumps.

24 hour service